Digital Animal
Ongoing engagement
Updated monthly · v1.2

Marketing Reviewfor Xcel Partners

Two programs on one page. Marketing reports against the agreement from 1 August 2026. The PR program starts 1 October 2026 and runs six months. Every figure is labeled committed, targeted or reported.

August 2026

Month 1 · Development Days 1 to 31

Engagement day 1 was 1 August. Two contract gates fall inside this month: day 21 on 21 August, and day 30 on 30 August. Month 1 is the build month. Assets get made, almost nothing publishes. Day 60 lands 29 September and day 90 lands 29 October.

Workstream A · Category positioning

5 deliverables

The five deliverables named in the agreement, each against its committed day.

DeliverableCommittedStatusNote
Interactive ShowroomDay 30 · 30 AugConfirmStatus to confirm
Principal authority build, four partnersDay 21 · 21 AugPart delivered16 posts and 2 carousels drafted. Tier B held pending Xcel confirmation.
Long-tail search authority, 8 to 12 buyer queriesDay 60 · 29 SepIn buildArticles 1 to 4 drafted. Articles 5 and 6 in rewrite.
Stakeholder Diligence KitDay 21 · 21 AugConfirmStatus to confirm
Category Presence MonitorDay 21 · 21 AugConfirmBaseline date to confirm

Workstream B · Tariff recovery campaign

Outbound

Outbound to Xcel's existing book of importers, manufacturers and capital project operators. Leads route to the white-label CRM.

MeasureAugTargeted rangeRead
Touches, all channelsStanding by300 to 500 per monthStanding by
ConversationsStanding by8 to 15 per monthStanding by
Leads routed to CRMStanding bynot rangedStanding by
Campaign live dateto confirmdays from signatureStanding by

Track 01 · Category Presence

Committed

Committed. Staked on directly.

ItemDueStatus
Search visibility baseline captured week 1Week 1Confirm
Showroom live and shareableDay 30Confirm
Principal authority assets liveDay 21Part delivered
Stakeholder Diligence Kit deliveredDay 21Confirm
Category Presence Monitor liveDay 21Confirm
Measured search visibility movementDay 90Not yet due

Track 02 · Authority Shipped

Committed

Committed. Staked on directly.

ItemDueStatus
Publishing cadence from each principal, sustained 90 daysDay 1 to 90Held
Long-tail content library published and indexedDay 60In build
Sector-specific case-shaped contentDay 90Not yet due
Read this before the cadence rowCadence cannot start until the capability confirmations below are cleared. Drafted posts are finished work sitting on the shelf.

Track 03 · Prospect Experience

Targeted

Targeted, not committed. These show the engine working.

MeasureAugRead
Showroom completion by named account and buyer roleStanding byStanding by
Multi-persona coverage at named accountsStanding byStanding by
Re-engagement signalStanding byStanding by

Track 04 · Coverage

Reported

Reported, not staked on. Outside direct control.

MeasureAugRead
Named-account presence map, 30 to 50 accountsStanding byAccount list defined with the partners
Pipeline by decision taxonomy: pursue, fund, fix, walk awayStanding byStanding by
Discovery calls and proposals, tracked weeklyStanding byStanding by

Website

Separate retainer

Reported here for convenience. This work sits under the website retainer, not the engagement above.

ItemStatusOwner
Homepage rewrite, ten section spineDraftedDigital Animal, pending Xcel
Homepage v3 buildMockupDigital Animal
Technical auditCompleteDigital Animal
Schema markup, six typesBuiltDigital Animal
Analytics, tag manager, conversion trackingScheduledDigital Animal
Heading hierarchy and copy errorsFixed in v3Digital Animal
Contact form fieldsScheduledDigital Animal
Conflicting addresses across pagesWaitingXcel
Broken social links in footerWaitingXcel
Team page returns a 404WaitingXcel
Why this matters to the numbers aboveThe live site carries no analytics and no conversion tracking. Until that ships, search and visibility rows are external estimates rather than measurement.

September 2026

Month 2 · Build and Deploy Day 32 to 61

Month 2 takes month 1 output live. Day 60 falls on 29 September: the long-tail content library published and indexed. This is the first month that produces measurement rather than estimates, because tracking goes in first.

Committed for September

10 items

Owners and dates, not intentions.

WorkOwnerDue
Long-tail content library published and indexedDigital AnimalDay 60 · 29 Sep
Articles 5 and 6 rewritten to the correct offeringDigital Animalset on call
Carousels 09 to 12 rebuiltDigital Animalset on call
Tier A posts published, cadence startedDigital Animalset on call
Tier B posts released or cutXcelset on call
Analytics, tag manager, conversion tracking liveDigital Animalset on call
Homepage copy final, v3 built and deployedDigital Animal, pending Xcelset on call
YouTube channel created, branded and configuredDigital Animalset on call
Meta channel created, branded and configuredDigital Animalset on call
Team page live with partner historiesXcelset on call

LinkedIn

Cadence starts

Month 2 is when publishing begins. Target three posts per week across the partner set, plus carousels.

MeasureSep, targetedRead
Posts published12 to 13Standing by
Carousels published2Standing by
Impressionsbaseline monthStanding by
Engagement ratebaseline monthStanding by
Follower growth across partnersbaseline monthStanding by
Profile views from target titlesbaseline monthStanding by
Register decision needed before draftingVoice is currently inconsistent across the eight published posts. Recommendation: thesis posts in company voice, profile and reflection posts in Dan's voice. One decision, documented, applied retroactively.

Social channels

YouTube and Meta

Channel creation in September. Both are repurposing surfaces for LinkedIn and Substack output, not origination channels.

ItemStatusOwner
YouTube channel created, branded and configuredSeptemberDigital Animal
YouTube: first video publishedSeptemberDigital Animal
Meta channel created, branded and configuredSeptemberDigital Animal
Meta: organic quote and question cardsOctoberDigital Animal
Meta paid testNot approvedXcel decision
Meta stays low priorityTreated as repurposing with a light test before any budget commitment. No spend without a separate approval.

Market analysis

4 inputs

What the market is doing, and what it means for the content and the account list. Reported, not staked on.

InputCadenceRead
Competitor content and positioning movementMonthlyStanding by
Buyer query and search demand shiftsMonthlyStanding by
Sector and capital project signals across the nine sectorsMonthlyStanding by
Named-account activity: hiring, sanction, fundingMonthlyStanding by
What this feedsReactive posts, the 24 open LinkedIn slots left unallocated in the campaign, and the named-account presence map in Track 04.

Content campaign · six month master list

Sep and Oct

Six pillars built from the eight posts published to date. Each pillar anchors a month and carries LinkedIn posts, carousels, a Substack pair, and video. Titles only. Nothing drafted.

MonthPillarAnchor
Sep 2026P3 Capability GapSets the category and the market condition
Oct 2026P2 Whose Side Are You OnEstablishes independence as structural
Nov 2026P1 Readiness GateThe core intellectual property
Dec 2026P5 InvestableConverts, aimed at the raise
Jan 2027P4 Execution StructureMoves from advisory to delivery
Feb 2027P6 The PeopleProof, pedigree, earned media

September · P3 Capability Gap

AssetTitles
LinkedIn, 8A capability gap has opened across the capital projects market · Decades of experience left the building, the projects did not get smaller · Supplying resumes is not the same as building an owner's organization · Three things called owner's representation, only one of them is · Not everyone who offers owner's representation has sat on that side of the table · Filling seats and holding accountability are different services · The large firms will sell you a partner and staff you with a graduate · Why we do not sell engineering hours
Carousels, 2C10 The Capability Gap in Capital Projects, 8 slides · C12 What Owner's Representation Actually Requires, 9 slides
Substack, 2The Capability Gap: What Happened to the Owner's Organization · Three Things Called Owner's Representation
YouTube, 2Y1 Prudence Is Your Greatest Edge, already scripted · Y10 The Capability Gap
MetaChannel setup only. Repurposing begins October.

October · P2 Whose Side Are You On

Four items held pending the 4D narrative decisionIndependence as a structural position reads differently once Xcel owns a contractor. The owner visibility and controls titles run as planned. The four marked Held wait for Dan's call on advisory plus delivery.
AssetTitles
LinkedIn, 10Their project controls team works for them, who is controlling the project for you · An EPC contractor can perform perfectly while the project moves in the wrong direction · Eleven things an owner needs visibility of that no contractor will hand you · If all your project information originates with the contractor, who is protecting the owner · Reporting tells you what happened, controls tell you what happens next · Independence is not a value, it is a contractual position Held · The forecast completion date and the real completion date · Duplicating the contractor's function is not the same as owning the mandate Held · Objective challenge without internal politics · We are not there to replace management Held
Carousels, 2C2 Who Is Controlling the Project for the Owner, 8 slides · C3 Eleven Things the Owner Must See, 13 slides
Substack, 2Whose Project Controls Are These · Independence Is a Contractual Position, Not a Character Trait Held
YouTube, 2Y7 Who Is Controlling the Project for You · Y8 The Eleven Views an Owner Needs
MetaQuote cards, question cards, carousel reposts cropped to 4:5

Volume across six months

Asset typeCountNote
LinkedIn posts54 titled78 slots, 24 left open for reactive and news-driven
Carousels12Two per month, existing build standard
Substack articles12One per fortnight, feeds the search and answer engine layer
YouTube videos18Four series, cut to 9:16 for LinkedIn and Reels
Meta assets55 organicPlus two paid tests, not approved
Blocked before anything draftsDelivery-for-equity needs Dan's explicit clearance on how publicly that model is offered and to whom. It sits in one post, one carousel and one article. Partner bios from Josh, Brian and Omar block pillar 6 and the interview video series entirely. Award and client references need naming permissions before any derivative carries them.

The rest fills in on 1 October

September reports in the same shape as August, against the same contract gates.

  • Workstream A, five deliverables
  • Workstream B, tariff recovery campaign
  • Track 01 Category Presence, committed
  • Track 02 Authority Shipped, committed
  • Track 03 Prospect Experience, targeted
  • Track 04 Coverage, reported
  • LinkedIn
  • Social channels
  • Market analysis
  • Content campaign
  • Website
  • Waiting on Xcel

PR Program

Oct 2026 to Mar 2027 Starts 1 Oct

Marketing owns the channels. This program owns reputation: earned media, third-party validation, a paced news calendar, and governance. Xcel has momentum it has not told anyone about yet. Unannounced wins decay. The job is to turn each one into a paced, credible public story that institutional buyers, lenders and investment committees meet repeatedly over two quarters. Q2 2027 renewal review in late March.

3
Q4 announcements
Targeted
6 to 10
Q4 earned placements
Targeted
2
Q1 announcements
Targeted
10 to 15
Q1 earned placements
Targeted

Narrative

Needs sign-off

One idea, reinforced by every release, byline and pitch.

Core lineXcel is the advisory firm built by people who actually delivered the projects. Draft, needs Dan
Anchor taglineWhen serious capital is at risk, hope is not a strategy. Keep
DifferentiationThe competitor audit of Sisu Project Advisory and CCS showed the category competes on adjectives. Delivery-side pedigree is the only structural differentiator. Lead with evidence, never adjectives.
Open decisionOnce 4D closes, does the story become advisory plus delivery? That changes the independence message in pillar P2. Structural independence claims were already pulled from the site ahead of the acquisition. Resolve with Dan before the 4D release is drafted.
Operating rules for every PR deliverableNo em or en dashes. American English. Every figure labeled committed, targeted or reported. No client name, award or dollar figure goes public without written sign-off from Dan. Dan's voice follows the voice guide: Register B for LinkedIn and bylines, Register C for releases and pitches.

Message house

3 pillars

What each pillar says, and the proof available once cleared.

PillarWhat it saysProof, pending clearance
Delivery pedigreePartners spent careers building what other firms only analyzePartner project histories. 4D acquisition adds field delivery capacity.
The readiness gateEvery project is a series of gates. Xcel tells you if you are through.Dan's readiness framework, pillar P1, and the question stack
Speed and senioritySenior people do the work, and it shows in resultsRio Tinto vendor approval in four weeks vs. a typical six months Reported · Tampa award won in open competition Reported

What we have

9 assets

Existing work the PR program sits on top of.

AssetStatusPR use
Dan Kraus voice and style guideDoneBylines, release quotes, LinkedIn
Voice test postsAwaiting Dan's markupCalibrate byline register
Homepage rewrite and v3/v4 mockupSign-off flags openNewsroom destination for every release
Live site fixes docDoneCredibility before press traffic arrives
Six-month content campaign, P1 to P6MappedAmplification layer for each announcement
LinkedIn post builderBuilt, AI presets on holdAnnouncement graphics
"Prudence Is Your Greatest Edge" video scriptDonePress kit and YouTube launch asset
Competitor audit, Sisu and CCSDoneShare of voice baseline
Momentum stories4D pendingTampa contract and office, Rio Tinto approval, data center pipeline, 4D acquisition

Digital Animal builds in October

9 items

What we owe before the first announcement. Items Xcel owes are in Waiting on Xcel at the bottom of the page.

BuildStatus
Message house and approved boilerplateOctober
Press kit: fact sheet, boilerplate, partner bios, headshots, logos, video, sector one-pagersOctober
Newsroom page on xcel-partners.comOctober
Media list by tierOctober
Release templates and a disclosure and approval workflowOctober
Analytics, GTM, conversion tracking, LinkedIn Insight Tag and contact form on the live siteCritical path
Media monitoring and reportingOctober
Wire service account, Business Wire or PR Newswire, for the 4D announcementOctober
Planner backend so approvals persist, Go High Level or D1Before Oct 1
Nothing is measurable until tracking shipsInbound inquiries and pipeline sourced both depend on the contact form and conversion tracking.

Program workstreams

A to F

Six workstreams. Each announcement pulls from all of them.

WorkstreamWhat it covers
A · News calendarFour stories paced three to four weeks apart so Xcel appears in market every month. Each gets a release, a LinkedIn post from Dan and the company page, a Substack follow-up, and a newsroom entry.
B · Earned mediaTiered targets across regional business, trade, and finance press. See Media targets.
C · Thought leadershipOne Dan byline per month from pillars P1 to P6. Lead topics: the readiness gate, why optimism is not a capital strategy, what investment committees miss in data center builds, tariff exposure on capital projects.
D · Speaking and awards2027 conference slots and awards with Q4 and Q1 deadlines. Candidates to verify in the first week of October: CII Annual Conference, AACE International, Data Center World, Houston Business Journal awards, POWERGEN.
E · Executive visibilityDan's LinkedIn refresh, media training, a bank of pre-approved quotes by topic, and a reactive commentary list for breaking stories on tariffs, grid demand and data center power.
F · Governance and measurementApproval workflow, disclosure protocol and the monthly report. See Governance.

Media targets

3 tiers

Tier 3 opens once 4D and a second named client are public.

TierOutlets
Tier 1 · Regional businessHouston Business Journal · Tampa Bay Business Journal · Houston Chronicle business desk
Tier 2 · TradeENR · Utility Dive · POWER magazine · Oil & Gas Journal · Mining.com · Data Center Dynamics · Construction Dive
Tier 3 · Finance and PEPE Hub · Infrastructure Investor · Project Finance International After 4D

Q4 2026 · Foundation and first announcements

Oct 1 to Dec 31

Holiday blackout from Dec 21. No releases in that window.

Week ofFocusDeliverablesDepends on
Oct 1KickoffKickoff call with Dan. Clearance list sent. Tracking install begins.Signed scope
Oct 5NarrativeMessage house and boilerplate drafted. Media list v1. Award and conference deadline audit.Kickoff
Oct 12Press kitPartner bios, headshot shoot scheduled, fact sheet, newsroom page builtBios and clearances, Oct 9
Oct 19Launch prepTampa release drafted and approved. Dan media training. Dan LinkedIn refresh.Tampa details
Oct 26Announcement 1Tampa power plant contract and Tampa office. Pitch HBJ, Tampa Bay Business Journal, Utility Dive, POWER.Client naming clearance
Nov 2AmplifyDan LinkedIn post, Substack article, carousel. First byline pitched: the readiness gate.Announcement 1 live
Nov 9BylineByline 1 placed, or published on Substack if unplaced. Conference abstracts drafted.Dan review
Nov 16Announcement 2Rio Tinto approved vendor, or "global top three mining group" if not cleared. Pitch Mining.com, ENR.Rio Tinto clearance
Nov 23ThanksgivingLight week. Monthly report 2. Reactive commentary list ready.None
Nov 30SubmissionsAward entries and speaking abstracts submitted. Byline 2 drafted.Dan review
Dec 7Announcement 3Data center pipeline as a trend piece with Dan commentary, no client names unless cleared. Pitch Data Center Dynamics.Pipeline facts
Dec 144D prep4D release, FAQ and holding statement drafted. Wire account ready.4D timing from counsel
Dec 21BlackoutQ4 report and Q1 plan to DanNone
Q4 targets, targeted not committed3 announcements, 6 to 10 earned placements, 2 bylines, 4 award or speaking submissions, newsroom live, tracking live.

Q1 2027 · The 4D story and scale

Jan 4 to Mar 31

The acquisition is the anchor. It moves Xcel from new advisory firm to advisory plus field delivery, and it is the story that reaches finance and PE press.

Week ofFocusDeliverablesDepends on
Jan 4RestartQ1 media list refresh. 2027 outlook byline from Dan: what capital projects face this year.Dan review
Jan 11BylineByline 3 placed. Reactive commentary pitching on tariffs and grid demand.None
Jan 18Announcement 44D Construction acquisition: wire release, trade and regional pitches, Tier 3 finance pitches, Dan and 4D leadership interviews.Deal closed and counsel approval
Jan 25AmplifyLinkedIn series. Substack deep dive on why an advisory firm bought a contractor. Updated site and boilerplate.Announcement 4 live
Feb 14D refresh kickoffPhase two scope begins: 4D PR, web, AI swarm, separate SOWSigned phase two
Feb 8Case studyFirst cleared engagement outcome published, anonymized if neededClient permission
Feb 15SpeakingConfirm accepted slots. Prep talk track from the readiness gate framework.Acceptances
Feb 22BylineByline 4. Podcast guest pitches to infrastructure and PE shows.None
Mar 1Announcement 5, flexNext win: new named client, key hire, or a second office milestoneWhatever is cleared
Mar 8AwardsFollow up on submissions. Amplify shortlist announcements.Results
Mar 15BylineByline 5. Share of voice report vs. Sisu and CCS.Monitoring data
Mar 22ReviewSix-month results report. Q2 2027 renewal proposal to Dan.All data
If 4D slipsAnnouncement 5 moves into the Jan 18 slot and 4D goes out on the first available date after close. Never announce before counsel signs off.
Q1 targets, targeted not committed2 announcements, 10 to 15 earned placements, 3 bylines, 1 published case study, 2 podcast appearances, at least 1 confirmed speaking slot.

Amplification · pillar per announcement

4 announcements

The six-pillar content campaign stays as the amplification layer. Each announcement week carries the pillar that matches the story, pulled from the existing titles.

AnnouncementPillar carriedTitles that week
1 · Tampa
Oct 26
P4 Execution StructureThe first 90 days of a capital project often determine the next three years · Most projects do not struggle for lack of technical capability · The best projects are not the ones with the biggest budgets
2 · Rio Tinto
Nov 16
P4 Execution StructureGovernance that accelerates decisions rather than slowing them · One integrated plan, or ten disconnected ones?
3 · Data center pipeline
Dec 7
P5 Investable, P1 ReadinessInvestors are not underwriting your technology, they are underwriting your ability to build it · Is this really a $100 million project, or is it $50 million? · Technology optimism cannot become project execution optimism
4 · 4D acquisition
Jan 18
P4 Execution StructurePMC or developer, the structural choice most owners make by accident · Single point of accountability, and what it actually costs to have one · Great technology, no delivery organization
Sequence noteThe monthly pillar order stays as mapped. Announcement weeks pull matching titles forward from later months, mostly P4, so nothing that already ran in September repeats. P4 goes into January lighter as a result, which suits the 4D month: the gap fills with acquisition-specific posts.

Governance and measurement

Monthly report

Every approval is logged in this planner with name and timestamp.

Approval workflowDigital Animal drafts, Dan approves. Josh, Brian and Omar get a 48 hour review window on anything naming a client or a figure. 4D materials also go through deal counsel.
Disclosure protocolNo client name, contract value or acquisition detail shared with any journalist before written clearance. Embargoes only with Tier 1 and Tier 2 outlets we have worked with. A holding statement is drafted for every announcement in case of early leaks.

Monthly report to Dan, first week of each month

MeasureLabel
Placements and reach by tierReported
Share of voice vs. Sisu Project Advisory and CCSReported
Branded search volume and direct trafficReported
LinkedIn follower growth and engagement, Dan and the company pageReported
Inbound inquiries and pipeline sourcedReported Needs tracking
Status of submissions, bylines and clearancesReported

Budget items to scope with Dan

5 lines

Outside the current retainer. This program is the follow-on scope; the 4D refresh is positioned as phase two.

ItemBasis
Wire distribution for major releasesPer release
Media monitoring toolMonthly
Award entry fees and conference sponsorship or speaking costsPer entry or event
Photography session for partner headshotsOne time
Media training session for Dan, half dayOne time

Waiting on Xcel

open

Applies to every month and to the PR program. Tick an item when it is cleared; the page records who cleared it and when. Items marked Oct 9 block the PR calendar.